Project Size: 9,864 sq ft
Construction: Type Vb
Contract Type: Design-build
Facility Use: Multiple classrooms building
Description: 14 classroom building
Completion: 150 days
]]>Project Size: 15,232 sq ft
Construction: Type Vb
Contract Type: Negotiated
Facility Use: Middle school classroom building
Description: 12 classroom building connected to existing school
Completion: 120 days
]]>Project Size: 3,7329 sq ft
Construction: Type Vb
Contract Type: Design-Build
Facility Use: Elementary School
Description: 24 classrooms, five special use rooms, cafeteria, offices, library annex, and multipurpose exercise room
Completion: About 30 days
]]>The interior finishes include a polished and stained concrete floor on the lower level while a combination of Cintiva vinyl and carpet are used for the top floor. The exterior uses an EIFS wall cladding designed to provide a seamless transition from the existing structure to the new addition.
Project Size: 19,270 sq ft
Construction: IBC Type II-b
Contract Type: Stipulated Sum DesignBuild
Facility Use: Vocational Classrooms Administrative Offices Description Two-story permanent modular
Completion: 6 months
]]>Project Size: 18,088 sq ft
Construction IBC Type: V-b
Contract Type: Direct purchase through purchasing co-op
Facility Use: Middle school
Description: 13 classrooms, science lab & prep room, administrative office, & computer lab. Parapet wall profile with masonry exterior designed to match adjacent high school.
Completion: 8 months
]]>Project Size: 124,000 sq ft 13 buildings
Construction: UBC Type II
Facility Use: Classrooms
Description: Permanent modular Grade level entries
Exteriors: match existing school finishes
Completion: 9 months
]]>Project Size: 28,200 sq ft
Construction: IBC Type
Contract Type: Direct purchase through purchasing co-op
Facility Use: Two-story elementary school with elevator
Description: 17 classrooms, 2 science labs & prep room, administrative office, computer lab, & library. Parapet wall profile with masonry exterior designed to match adjacent high school.
Completion: 10 months
]]>The gymnasium is connected by a corridor to the main high school campus structure and was designed to match the architecture and interior and exterior finishes of the existing building. The gym area contains basketball and volleyball courts along with a gymnastic runway on a cushioned suspended wood floor playing surface.
The interior also includes a large split level lobby area, girls and boys dress – ing rooms, weight training room, coaching offices, concession area, and public restrooms.
Project Size: 20,500 sq ft
Construction Type: SBC Type II
Contract Type: Design-build with guaranteed maximum price
Description: Double-court gymnasium
Completion: 13 months
]]>