Efficient Government Modular Building Solutions - Ramtech Systems https://www.viennavahouses.com/blog/project_category/government-pmb-select/ Complete Modular Construction Fri, 03 Feb 2023 20:18:19 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Government Pier and Beam Modular Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/government-pmb-select/ 32 32 US Army – Multi-story Dormitory https://www.viennavahouses.com/blog/portfolio/us-army-corps-of-engineers/ Mon, 09 Oct 2017 08:45:07 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1501 This LEED Silver project is part of the MILCON Unaccompanied Enlisted Personnel Housing Advanced Individual Training Barracks at Fort Sam Houston in San Antonio, Texas. Ramtech was designated as a strategic subcontractor to Hensel Phelps Construction for the 116,480 square foot project, and was responsible for the manufacture, installation, and specific finish-out of the 152 individual modular sections that were used to produce the 272 room four-story building. All of the floor sections were designed and built as six-sided unitized boxes acting as rigid cubes when stacked together with each other. Because the AIT facility houses U.S. combat troops, the structure was built to meet the Army’s rigid Anti-Terrorism Force Protection construction standards and progressive collapse requirements for buildings three stories and above.

Building & Construction Details: Slab on Grade Permanent Modular Building

Project Size: 116,480 sq ft

Construction: IBC Type V-b

Facility Use: Housing

Description: 4-Story permanent modular facility LEED Silver 272 rooms

Completion: 365 days

 

]]>
US Navy – Childcare Facility https://www.viennavahouses.com/blog/portfolio/us-navy-childcare-facility/ Mon, 09 Oct 2017 08:42:09 +0000 http://ramtechgroup.com/empiredd/portfolio/authoritatively-benchmark-virtual/ Designed as a Child Development Center accommodating infants to grade school age children, this permanent modular facility replaced several dilapidated buildings and brought the Navy into compliance with federal work rules mandating childcare for civilian base employees.

Located at the China Lake Naval Air Station in China Lake, CA and encompassing over 25,000 square feet, the Center features all-steel construction, an EIFS stucco exterior, non-loaded corridors throughout the building, and a specially designed mist cooling system to handle the extreme heat in the courtyards and play areas.

Building & Construction Details: Permanent Modular Construction

Project Size: 25,000 sq ft

Construction: UBC Type V

Protected Contract Type: Design-build with stipulated sun

Facility Use: Child Development Center

Description: Permanent modular Full steel construction Stucco exterior, mist cooling systems in courtyards and play areas

Completion: 175 Days

]]>
NOAA – Weather Forecast Office https://www.viennavahouses.com/blog/portfolio/noaa-weather-forecast-office/ Mon, 09 Oct 2017 08:40:41 +0000 http://ramtechgroup.com/empiredd/portfolio/progressively-harness/ Located in North Richland Hills (Fort Worth) TX, this 10,800 square foot facility serves as the North Texas regional weather forecasting and broadcasting facility for the National Weather Service (NOAA).

As a complete development project, Ramtech was responsible for the acquisition of the land, space planning, all the architectural, engineer – ing and civil design, and the financing required to provide for a 10-year lease with 10 year renewal options. Using permanent modular construction, the building features wood and steel construction, a reinforced con – crete and steel tornado vault, raised computer flooring cover – ing over 50% of the interior area, perimeter security fencing, and a split-faced block exterior.

Building & Construction Details: Permanent Modular Construction

Project Size: 10,800 sq ft

Construction UBC: Type V, Protected Facility Use National Weather Service regional forecasting and broadcast facility

Description: Wood and steel construction Split-faced block exterior

Raised computer flooring Blast-proof shelter

Completion: 160 Days

]]>
Cottonwood Shores – Police Dept Headquarters https://www.viennavahouses.com/blog/portfolio/cottonwood-shores-police-dept/ Mon, 09 Oct 2017 08:25:33 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=5650 Located in Cottonwood Shores, TX, this 2,184 square foot facility serves as the Headquarters, administrative offices, break room, and interrogation room space for the five-officer police department.

The building was developed using pier and beam permanent modular construction with the modular sections installed on a stem wall foundation. A combination of 26 gauge R-panel siding and stone veneer were used on the exterior parapet wall which included a concealed roof line with additional height at the main entry. The interior is finished with vinyl covered gypsum on the walls and vinyl composition tile flooring throughout the facility.

Building & Construction Details: Permanent Modular Construction

Project Size: 2,184 sq ft

Construction: Type Vb

Description: Administrative offices and interrogation rooms

Completion: 45 Days

]]>
Hildago County – Interim Courthouse https://www.viennavahouses.com/blog/portfolio/hildalgo-county-courthouse/ Mon, 09 Oct 2017 08:15:32 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1484 Located in the center of down – town Edinburg, Texas, Hidalgo County’s decision to renovate their existing courthouse building created a series of challenges in how to secure adequate interim space for day to day operations during construction. To minimize the expense and the potential for costly delays, Hidalgo County chose to install three modular buildings totaling 14,000 square feet on a parking area adjacent to the existing courthouse. Ramtech provided assistance in the preplanning phase, and with the design and engineering for two buildings with five courtrooms, jury rooms, conference areas for the attorneys and their clients, judges chambers, offices for court staff and reporters, foyers with security at the public entrances, and an additional building for the county clerk’s office

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 14,000 sq ft 3 buildings

Construction: IBC Type V-b

Contract Type: BuyBoard

Facility Use: Courtroom and Admin Space Description R-Panel exterior siding, VCG walls, VCT tile flooring

Completion: 120 days

]]>
GSA – Childcare Facility https://www.viennavahouses.com/blog/portfolio/gsa-childcare-facility-2/ Mon, 09 Oct 2017 08:00:38 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=3001 Located on the bank of the Mississippi River in New Orleans, LA this 8,065 square foot daycare center was developed on a longterm lease to provide full-day childcare for the children of the local Army Corp of Engineers employees. As a design-build permanent modular construction project, extensive civil design and site development were required to bring the land up to a usable status.

The facility features all steel construction, architectural metal siding, an integrated entry canopy, and a full playground. This building was one of the few in the greater New Orleans area to survive Hurricane Katrina intact.

Building & Construction Details: Permanent Modular Construction

Project Size: 8,065 sq ft

Construction: UBC Type II Non-Combustible

Contract Type: Design-build 15 year lease

Facility Use: Child Development Center and Day Care

Description: Permanent modular Grade level entries Steel construction Architectural metal siding, mansard and canopy

Completion: 165 days

]]>
Veterans Administration – Hospital Expansion https://www.viennavahouses.com/blog/portfolio/veterans-administration-hostpital-atlanta/ Sun, 08 Oct 2017 08:25:08 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1572 When the Veterans Administration looked to expand the clinic space at the existing hospital in Atlanta, GA they chose an all steel two-story permanent modular building. Comprising 7,356 square feet, the construction project requirements called for minimal disruption to the existing parking area, requiring the entire installation of the modular sections to be completed in just one weekend. The building features an architectural aluminum panel exterior, spandrel window glazing, medical gasses integrated with the existing structure, and twin holeless elevators.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 7,356 sq ft 

Construction: UBC Type II-N

Contract Type: Design-build Stipulated Sum

Facility Use: Outpatient Clinic

Description: Two-story all steel construction Architectural aluminum panel exterior Spandrel window glazing Twin holeless elevators

Completion: 165 days

]]>